Transport and Industry Development Investment Joint Stock Company (Tracodi)
GAIA

GAIA

  • Construction Value: 101 million dollars
  • Investment Life: 20 years
  • Status: In construction
 
VNECO VINH LONG

VNECO VINH LONG

  • Construction Value: 34.5 million USD
  • Capacity: 50 MW
  • Schedule: 2020
 
BCG – CME LONG AN 1

BCG – CME LONG AN 1

  • Construction Value: $47,3M.
  • Capacity: 40.6 MW
  • Estimated completion: 2019
  • Investment Life: 20 năm
 
BCG BANG DUONG 40 MW

BCG BANG DUONG 40 MW

  • Construction Value: $40.5 million
  • Estimated infrastructure cost: USD 5 million
  • Capacity: 40 MW.
  • Land area: 50 ha.
  • Construction period: 2018 – 2019
 
GAIA 100 MW

GAIA 100 MW

  • Construction Value: $101 million
  • Estimated infrastructure cost: USD 10 million
  • Capacity: 100 MW.
  • Land area: 120 ha.
  • Construction period: 2018 – 2019.